最后进行施工结构打点试桩,在经过地质监理工程技术人员的检验合格后方可施工。
Finally, the construction of the construction of the test pile, in the geological supervision of the engineering and technical personnel after the construction of qualified.
东营港扩建工程为形成掩护水域和挡浪,后方承台采用预制钢筋混凝土挡浪板遮帘。
In order to form a shielded water area and keep out the wave in Dongying Port extension engineering, precast reinforced concrete wave boards were adopted in the rear platform.
提供与军队医院使用的“军卫一号”工程接口程序,实现了伤病员在野战医疗队的医疗处理信息与后方医院信息系统的衔接。
It also provides interface program with No. 1 military medical Project, which realizes the linking of medical treatment information about patient in field medical team and rear military hospital.
应用推荐