铜绿山矿某三铰拱屋架单轨吊梁结构体系,因技术改造增加设备简体重量,随意用滑轮组起吊检修,导致拱架上弦全截面贯通式开裂的结构事故。
Then the structural accident of total section drive-through type crack is caused in arch frame top chord, which is induced by hoisting and detection using pulley arbitrarily.
主拱为桁架式双拱肋,钢管拱纵向分13段制造,采用无支架缆索吊机安装、钢绞线斜拉扣挂施工。
The steel pipe arch was manufactured in 13 segments vertically, erected by cable crane without support and clasped by diagonal tension steel strand.
综合介绍了钢桁架拱桥适宜的几种施工方法,并对拱上吊机和缆索吊机的特点进行了比较。
Paper introduces several suitable construction methods of steel trussed arch Bridges and compares the different features between crane on the arch and cable crane.