主拱为桁架式双拱肋,钢管拱纵向分13段制造,采用无支架缆索吊机安装、钢绞线斜拉扣挂施工。
The steel pipe arch was manufactured in 13 segments vertically, erected by cable crane without support and clasped by diagonal tension steel strand.
拱肋纵向分7段预制,采用无支架缆索吊机安装、钢丝绳斜拉扣挂法施工。
The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.
采用有限元数值模拟方法,分别计算了这两种特大型起重桅杆在顶端钢丝绳斜拉条件下桅杆吊重的线弹性屈曲临界载荷。
The critical loads of linear elastic flexuosity were computed for 64,80 m hoist masts under the condition of inclined steel cable on the top using finite numerical simulation method.
应用推荐