高压、超高压输电线路的开关为分相开关,当对侧开关单相偷跳后,在线路负荷比较重、同时重合闸动作时间比较长的情况下可能引发系统振荡。
HV and EHV transmission lines are equipped with split-phase breaker. If a longer reclosing time is setting in a heavy load line, the system may swing after the trip without fault of remote breaker.
通过对断路器主触头与辅助触头的动作情况进行分析,提出了一种不用拆开合闸电阻与主触头的连接线就可以测量合闸电阻的方法,而且可以同时测出合闸电阻的提前合闸时间。
In this paper, the abnormal phenomenon of the closing time of a 500 kV circuit breaker was analyzed, and actions taken to avoid the condition in the other sites were put forward.
电网中运行的线路保护装置的重合闸误动作,将会引起人身以及电网事故。
The incorrect reclose of line protective devices in electric power system will result in personal injuries and system accidents.