汶川地震断裂带科学钻探项目一号孔(WFSD - 1)钻遇了30多米的断层泥。
The first drilling hole of the Wenchuan earthquake fault science drilling project (WFSD-1) experienced up to more than 30 meters of the fault gouge drilling process.
为了评价帷幕灌浆效果,将数字钻孔摄像技术应用到小浪底水利枢纽3号灌浆洞3个灌浆质量检查孔中。
In order to appraise the quality testing of grout curtain, digital borehole camera technology is applied to three boreholes of the grouting gallery no. 3 in Xiaolangdi Water Control Project.
衡水市问津街4号井1991年9月出现水温大幅度异常,经水质分析、井孔普查方法初步证明,水温大幅度升高与地震无关。
The No. 4 well at Wenjin Street in Hengshui City showed a large amplitude anomaly of water temperature in September 1991.
应用推荐