根据本条(c)款的规定,并且在需要时通过对《合同总价进度计划》的调整,在《期中付款证书》中使对变更的测量和估价生效。
Effect shall be given to the measurement and valuation of variations under sub-clause (c) of this clause in Interim Certificates and by adjustment, if required, of the Contract Sum Project Schedule.
介绍了钻孔桩地质变化引起的工程变更的估价原则和估价方法。
This paper introduces the appraisal principles and methods of engineering changes are caused by geologic changes in drilling hole pour pile.
应用推荐