在不同类型荷载作用下,双索面斜拉桥主梁不同位置的截面具有不同的应力分布规律。
The rule of stress distribution is different on different cross sections of the girder of cable-stayed bridge with double cable planes under different type of loads.
以广州东沙大桥独塔边跨带辅助墩的混合梁双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重、临时荷载、结构刚度、混凝土收缩徐变这些因素对混合梁斜拉桥成桥状态的影响。
The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.
摘要:上海闵浦二桥为独塔双索面钢板桁组合梁斜拉桥。
Abstract: Shanghai MinPu two bridge for single tower and double cable plane steel truss cable-stayed bridge of the composite beams.
应用推荐