并对裁弯取直和双河并存两个方案进行泥沙模型试验。
And sediment model experiment was carried out for the cut-off scheme and two compatible rivers scheme.
双河拱坝抗力体山体单薄,坝肩的稳定安全度均比较低。
For the resistance and mountain body of Shuanghe arch dam is thin and weak, safety factor of abutment stability is low.
由双河油田岩心观察可明确识别出七种基本的建筑结构要素。
Seven basic architectural elements can be distinctly distinguished through core survey in the Shuanghe oilfield.
应用推荐