无论是在突加电流还是在去掉电流的过程中,都存在着一个由磁化或去磁过程引起的初始滞后时间。
There was an initial delay time at either switching the step current on or off, which was caused by the magnetizing or de-magnetizing process.
由于直驱式风力发电机转速较低,定子绕组需要有较多的匝数以输出足够高的电压,因而绕组负载电流的去磁反应较大;
More turns of winding is needed to produce enough voltage because the DPMG rotates at low speed, but the armature reaction is high at same time.
永磁体的矫顽力有限,必须防止永磁体的不可逆去磁。
Because of limited coercive force of permanent magnet, the non-reversible demagnetization of it must be prevented.
应用推荐