如压力测试后如不立即试运行冷却器,应将冷却器的水排干(见第5项停用)。
The water should be let out if the trail run will not be done at once after pressure test.
功率变压器和扼流圈装置- - -第5部分:液体高度,压力流动指示计,压力释放装置和脱水器。
Power transformer and reactor fittings — Part 5: Liquid level, pressure and flow indicators, pressure relief devices and dehydrating breathers.
应用推荐