go top

有道翻译

厂房进水

Plant water intake

以上为机器翻译结果,长、整句建议使用 人工翻译

双语例句

  • 地下厂房进水高边坡稳定龙滩水电站建设必须解决重大工程技术问题

    The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.

    youdao

  • 河床水电站水头比较单机流量通常较大这样水电站厂房进水口、蜗壳和尾水管等尺寸较大。

    In general, the head pressure of power station in river channel is lower comparatively, but the unit discharge is always greater, in this way, the dimension of the hydropower house is usually larger.

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定