地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
河床式水电站水头比较低,而单机流量通常较大,这样水电站厂房的进水口、蜗壳和尾水管等尺寸较大。
In general, the head pressure of power station in river channel is lower comparatively, but the unit discharge is always greater, in this way, the dimension of the hydropower house is usually larger.
应用推荐