工程总体由首部枢纽、引水渠、前池、压力钢管、主副厂房、尾水渠等建筑物组成,采用建坝和新开一段明渠的引水方式。
The engineering is made up with head hinge, diversion canal, fore bay, steel penstock, lord factory building, and the tail channel.
我想与你们分享一段在我们的厂房拍摄的短片能让你感受一下实际的规模。
And I want to share with you a quick video from our facility that gives you a sense of how this looks at scale.
主厂房发电机层两段工作区的温度呈对称分布。
In the two working units the temperature is distributed symmetrically.
应用推荐