配置构建储存库工作区的流,以接受需要构建的流。
The flows for the build repository workspaces are configured to accept from the stream that needs to be built.
文章以试验为基础,对块石近区的流态进行了定性描述,探讨抛石护岸岸脚淘刷的机理。
In this paper, based on the fixed bed experiment, the flow regime near the riprap is described qualitatively, and the mechanism that the bank base of dumped riprap is brushed is discussed.
应用推荐