对点火升温所用设备,不同情况下升温速度进行了讨论,对包装、储运、砌筑等方面的一些问题提出了看法。
In this paper, equipment for ignition and speed for temperature rising in deferent conditions are discussed, problems for packing, handling and bricks laying are analyzed.
在覆盖、掩蔽或包装以备储运或运输之前,无论何时,当此类工作已准备就绪,承包商应及时通知工程师。
The Contractor shall give notice to the Engineer whenever any work is ready and before it is covered up, put out of sight, or packaged for storage or transport.
调查与测定了6个大化肥厂造粒和储运包装的运行情况。
This paper investigated the prilling, packing, storage and transportation of 6 large scale chemical fertilizer plants.
应用推荐