在确保大亚湾核电站安全运营的前提下,加快施工进度。
In premise of assuring the safety of Daya Bay nuclear power station, the construction speed can be increased.
可节约工时50%——70%,大大加快施工进度,缩短施工周期。
Saving hours of 50% — 70%, greatly accelerate the construction progress, shorten the construction period.
该方法在确保施工安全、加快施工进度、降低施工成本方面具有显著的效果。
This method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.
应用推荐