3.11 前验证 (Prospective validation) 指一项工艺、一个过程、一个系统、一个设备或一种材料在正式投入 使用之前进行的、按照设定的验证方案进行的验证。
基于52个网页-相关网页
代码签入前验证 Pre-check-in validation
当前验证码流 Current CAPTCHA flow
装运前验证 PSI Preshipment Inspection
装运前检验证书 Inspection Certificate for Pre-shipment Inspection ; CCIC ; PRE-SHIPMENT INSPECTION CERTIFICATE
埃及装运前检验证书 Certification For Pre-shipment Inspection
装运前符合性验证 Pre-shipment Compliance Verification ; Pre-shipment Compliansaso Verification
使用者前端验证 User Certificate Interface
验证当前系统 verifying current system
装船前检验检疫证 Pre-Shipment Inspection certification
“启动”节点中,以便在安装前验证序列号。
Start node in order to validate the serial number prior to installation.
前验证完成后,建立变更控制系统,以确保灭菌器保持在受控状态。
After the prospective validation has been completed, change control systems are established to ensure that sterilizers are maintained in a state of control.
由于各模块的分开及进入系统前验证用户身份,也加强了各种信息的安全性及保密性。
Because each module of the separate and enter the system prior to verify user identity, and also strengthened the all kinds of information security and confidentiality.
应用推荐