使用前一定要确保所有的螺母和螺栓都拧紧。
在安装前螺栓的螺纹及螺母应用防磨损剂包覆。
Threads of bolts and nuts shall be coated before installation with anti-galling agent.
承包商应于接头安装后一周重新拧紧螺母,并就在轨道最终衬砌和整平前再一次拧紧。
The contractor shall retighten the nuts one week after joint installation and a second time just before final lining and leveling of the track.
应用推荐