并用前模拉料销、限位拉杆和尼龙开闭器控制开模运动顺序,实现了浇注凝料的自动脱模。
Fixed mould puller pins, stop drag-bars and nylon shutters were used to open the mould sequentially.
底盘总成,前立架,后立架,后压板,拉杆。
Chassis Assembly, Front Vertical Shelf, Back Vertical Shelf, Back Pressure Panel, Rod.
论文针对集装箱起重机振动现象较为严重的三处:机房、斜拉杆、前大梁进行了振动分析和抗振研究。
The dissertation works on machinery house, fixed tie link and boom, which vibrate most severely on the container crane.
应用推荐