元代,因村落前有一大片高低不平的坑地,故取名“前坑”。另有一种说法,村中有一座“坑仔山”,村民在其附近建屋居住,故称“前坑”。
悬停坑试验是机载STOVL系统测试开始前最后一系列地面测试。
The hover-pit tests are the final series of ground tests before airborne STOVL testing begins.
这片昔日的农田在1964年前是被用作采砾坑的。
This area of former farmland was worked as a gravel pit until 1964.
液压站在安装前应首先作地基平整处理,并打好地脚螺丝的预埋坑。
Prior to installation of the hydraulic station, firstly level the foundation, and dig the embedded pits for the foundation bolts.
应用推荐