论述了从初步设计到工程竣工验收各个阶段工程建设的造价控制。
It is discussed how to control the cost of a project in its various stages from the beginning of design to the cheeking before acceptance.
根据甲方的要求,乙方依照《工程建设协议》的约定,于2005年5月5日与甲方共同对工程项目进行初步移交验收。
Party B may, in accordance with Construction Agreement, as well as Party A make joint acceptance and inspection of construction Project as required by Party A on May 5th, 2005.
本系统通过实际制作,实验室调试,目前已通过委托企业的初步测试验收,各项指标都能达到设计要求,运行良好。
Through actual manufacture and laboratory debugging, this system now has passed the enterprise 's preliminary test approval and each target has achieved the design request and the movement was good.
应用推荐