刚性横梁(8)的高度在侧边加劲肋板(2)顶部之上。
The height of the rigid crossbeam (8) is arranged above the top part of the side stiffening rib plate (2).
根据多梁式斜梁桥结构及其横向受力特点,提出了“弹性支承刚性横梁法”进行跨中荷载横向分布的计算。
The elasticity support rigidity crossbeam method is brought forward according to orientation structure endure force character of skew bridge with multilongitudinal beams.
相邻支架的横梁通过连接装置形成一体化的刚性梁,相邻支架的顶梁通过滑块相互连接。
The cross beams of the adjacent supports form an integrated rigid beam through a connecting device, and the top beams of the adjacent supports are mutually connected by a sliding block.
应用推荐