分发,选择分配顶部,分配水平中心,分配底部,往左分发,分配垂直中心,或者正确分发。
For Distribute, select Distribute Top, Distribute Horizontal Center, Distribute Bottom, Distribute Left, Distribute Vertical Center, or Distribute Right.
例如,在管理层级的底部,项目经理被分配到整个规划中的不同项目。
For example, at the bottom of the management hierarchy, project managers are assigned to the various projects within the overall program.
我们可以通过移动位于底部的滑动条来改变能量的分配方案,从而使得TriBot发生转向。
The slider at the bottom can be changed to apply power unequally, resulting in turning the TriBot.
应用推荐