... 土木工程施工分包合同条件 FITIC 分包合同费用/现场施工分包合同费用: subcontract cost ; field subcontract cost TOP 由于停止施工引起的合同终止 cessation of work ...
基于52个网页-相关网页
...施工间接费用:cost of contruction indirects 分包合同费用/现场施工分包合同费用:subcontract cost/field subcontract cost TOP ..
基于48个网页-相关网页
现场施工分包合同费用 subcontract cost ; field subcontract cost
分包商在分包合同范围内履行、完成和修补工程质量缺陷等工作的费用均已包含在附件III的总价内。
The Sub-Contractor undertakes to execute, complete and remedy any defects in the Sub-Contract Works at rates or lump sum price(s) included in Annex III.
承包商将为整个项目投保承包商一切责任险以及第三者责任险,该保险已包含了分包合同的公工作,分包商无需为此承担费用。
The Contractor shall obtain the Contractors all Risk and Tird Party Liability insurance for the entire contract works, which shall include the Sub-Contract works at no cost to the Sub-Contractor.
应用推荐