实际应用显示钢板桩的实施有利于减小渗流水头、降低堤身浸润线和出逸比降。
The effect of practice showed that the seepage prevention wall is beneficial to reducing the seepage water head, decreasing the seepage line inside dike and escape gradient.
为了控制基础渗流和出逸坡降,设计采用了塑性混凝土防渗墙、帷幕灌浆以及在下游增设一套减压井相结合的方案。
To control foundation seepage and exit gradient, a plastic concrete cut-off wall, a grout curtain, and a set of downstream pressure relief Wells are incorporated in the design.
逸出实验器件的光少于1%,研究者说,如果用更好的激光器,有可能达到更高的吸收率。
Less than 1 percent of the light escapes in the demonstration device; with better lasers, the researchers say, even greater absorption should be possible.
应用推荐