在编制编组站阶段计划时需解决的一个核心问题是确定出发列车的车流来源。
The core of the phase plan of a marshalling station is to identify the source of the flow of departure trains.
从分析可以得到:如果某到站的车流量较少,根据车站的实际情况,可以考虑开定点出发列车。
In the case of small flow of arrived vehicles, we can consider to run the fixed point departure train on the basis of station practical situation.
10:52分开往济南的列车现将从7号站台出发。
应用推荐