第七部分是结语,对前述第二到六部分的内容作一总结。
The 7th section of conclusion serves as a summary for the above-mentioned sections.
现在,在第六部分(最后的部分),我们将着眼于能够帮助经理进行优先级划分、计划以及度量开发项目的工具。
Now, in this sixth and final installment, we will look at tools that can help managers prioritize, plan, and measure development projects.
在完成本教程之后,可以继续学习本系列的第六部分,第六部分概述了业务度量模型,使用该模型可以监视、分析和报告实际的运行时数据。
After you complete this tutorial, continue with the sixth tutorial covering the business measures model, which allows you to monitor, analyze, and report on actual runtime data.
This was a series put together by a British filmmaker who's actually narrating this named Antony Thomas who did a terrific-- I think six or seven part series for British television and several of those got collapsed into a one hour special on Nova that was shown in the United States.
这一系列片由英国制片人安东尼·托马斯,亲自解说,是他为英国电视台制作的,大概由六到七部分组成,其中一些被选入了"新星"系列科教片,被做成一小时特别节目在美国上映
应用推荐