拉森桩支护技术在基坑支护中起到了保证工期、节约成本的作用。
The Lasson pile supports and protections technology in the hole excavated for building foundation supports and protections, played the guarantee time limit for a project and the frugal cost role.
模板体系的选择合适与否,对保证混凝土的几何尺寸,保证工期,降低成本起着重要作用。
Reasonable form system plays an important role in ensuring physical dimension of concrete and reducing time limit and engineering cost.
而采用JSD电缆输送机敷设电缆的施工工艺,既安全可靠又节约成本,而且能够有效保证工期和质量。
However, the construction technology with JSD cable conveyer is used to lay cable, which has many advantages such as safety, saving cost, ensuring period and quality.
应用推荐