1996年任楼煤矿首采面曾因隐伏导水陷落柱突水,引发淹井灾害,造成3.5亿元的重大经济损失。
Because of water outburst by hidden conducting Karst collapse column at the mining area of Renlou coal mine, the flood was caused in 1996, which causes losses up to 3.5 hundred million yuan.
隋允康、任旭春。斜井单螺杆抽油泵柱和扶正器间距的最优设计。计算力学学报,2002,1(19):58-62。
Optimization of Shaft Size and Centralizer Span of Single Screw Pump in Declined Oil Well. Chinese Journal of Computational Mechanics. 1(19):58-62.
应用推荐