理论而言,最理想的是明光低温的条件,外加凉风或其他的人工冷却方式。
Ideally, you want bright light and cool conditions, and a good breeze or other artificial cooling.
大体积混凝土人工冷却方法有很多种,在工程实践中采用最多的是埋设冷却水管。
There are many ways in engineering to artificial cooling in mass concrete, and the most commonly used is cooling pipe.
从工程及时受益的要求来看,需要采取人工冷却措施来控制混凝土的温升和降低混凝土的温度。
For meeting the requirements of the project, it need an effective artificial cooling to control the temperature rise or reduce in mass concrete.
应用推荐