交货期是指顾客下订单到收到产品的时间间隔。从物流的角度看交货期,可以分阶段:采购周期+生产周期(排队与等待时间+加工时间)
成本(C-Cost):产品成本要低,即设备能源、原材料等耗费少。交货期(D-Delivery):设备故障少,不耽误合同规定的交货期。安全(S-Safety):设备的安全性能好,设备对环境污染小,文明生产。
基于3472个网页-相关网页
...e of shipment)指卖方在约定的装运地点,将 其出售的货物装上运输工具或交给承运人装运的时间; – 交货期(time of delivery)是指卖方在约定的交货地点将 货物交给买方处置的时间。
基于2473个网页-相关网页
... 可根据客户的要求或来样,完全配合客户的需要。According to the customer's 交货期:date of delivery 广东省广州 In guangzhou, guangdong ...
基于442个网页-相关网页
交货期条款 Delivery Time Terms
交货期限 [贸易] delivery term ; Lead Time ; Delivery Period ; time of delivery
交货期条目 Delivery Time Terms
确认交货期 confirm delivery date
交货期限控制 [贸易] delivery control
估计交货期 estimated delivery date
交货期延迟 de-expedite
约定交货期 period stipulated for delivery ; [贸易] period of stipulatad for delivery
Therefore, it makes great sense to study on the economical and effective performance of product delivery time compression by using component commonality in ATO.
所以,研究通用策略对缩短ATO产品交货期的经济性和有效性具有很强的现实意义。
参考来源 - ATO通用零部件对压缩产品交货期的影响研究Flow shop; multiple delivery date; TOC; dynamic bottleneck; system decomposition.
流水线车间调度; 多交货期; 约束理论; 动态瓶颈机; 系统分解。
参考来源 - 基于动态瓶颈的多交货期Flow Shop分解策略This paper studies single-machine fuzzy scheduling problem. We formulate three kinds of scheduling model on the basis of fuzzy processing time and fuzzy due date.
本文研究了单机模糊调度问题,基于模糊加工时间和模糊交货期建立了三种调度问题的模型,采用遗传算法搜索最优排序。
参考来源 - 用遗传算法解决模糊加工时间与模糊交货期下的单机调度问题Simulation indicates the recursive reasoning algorithm based on delivery date is feasible and effectual. It can carry out the optimization in subsection processing time, subsection storage cycle and production cost, etc.
仿真实例表明,基于交货期的逆序递推算法是可行的,也是有效的,能实现分段加工时间、分段库存周期和生产成本等方面的优化。
参考来源 - 中小型企业资源计划生产管理系统研究与实现The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
参考来源 - 基于交货期的模具生产作业调度规划研究及软件实现Delivery deadline should be determined by managing neck resource of small batch order form, quantity risk of technology and the longest period of process piece. Delivery deadline and cost all correlate with technology project.
交货期取决于中小批量订单的瓶颈资源运用﹑工艺方案的质量风险﹑快速换模技朮以及加工周期最长的工件等方面,这些都与工艺方案的优劣息息相关﹐同时,工艺方案的优劣也直接关系到产品制造成本的高低。
参考来源 - 钣金零件工艺特点及对交货期与成本的影响分析·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐