本工艺对减免井架施工的占井工期、缩短整个矿井建设工期有一定的意义。
The technique conduce to decrease time due to installing headgear occupy shaft alone and cut construction time of whole mine.
从调查地质情况、钻测试井、获得开发许可到钻工作井和建设发电机组,现场的完全开发需要数年的时间。它也需要大量的资金。
It takes years to fully develop a site, from surveying the geology, drilling test Wells, receiving permits, drilling working Wells and building generators.
充分利用空间和时间组织平行作业,缩短了主井装载系统建设工期2.5个月。
The main shaft to load the system construction work was shortened to expect 2. 5 months under well using of space and times organize homework.
应用推荐