分析了注浆井底压力和原区压力与注浆时间、浆液粘度、渗透率、计算点与注浆井距离等关系;
The pressure in well bottom relation with the time of the injection and the viscosity of cement liquid, and the permeability in the confined aquifer are analyzed.
但是,在第一趟测井中或者泥浆循环后测量的井底温度不是最高的,此时最高温度在井底上面的一段距离中测量出来。
However, on the first logging run or runs after circulation, the mud may be hottest some distance above the bottom of the hole.
应用推荐