维修低压设备和给低压设备停送电,包括罐区的泵、主车间泵和消防泵泵。定期测试电机和配电柜的绝缘。
Repair lower voltage equipments and power transmission includes tank farm pumps, main workshop and fire fighting water pump. Regular test motor and distribution cabinet insulation.
每日巡检区域包括蒸气系统、压缩空气系统、主车间和罐区。
Daily check includes steam system, air compressor system, main workshop and tank farm.
ASU生产过程从一个主气流压缩机开始,产品储存罐的输出后结束。
The ASU manufacturing process begins with a main air compressor and ends at the output of the product storage tanks.
应用推荐