采取以上措施后,保证了主控楼的设备安全可靠地运行。
The actual results show that above measures can insure the secondary system equipments in control building running reliably and safety.
通过对某煤矿主控楼现场动态测试分析,找出该楼异常振动的原因。
By dynamic test and study, the reason of abnormal vibration for control building is found out. By ways of changing rotate speed of enginery, the vibration of structure is reduced.
应用推荐