附加弯矩导致桅杆的后背主弦杆受拉,传统的螺栓连接方法显得薄弱。
The additional bending moment results in the pulling state of rear back rod of the mast and the conventional bolt connection seems to be very weak.
指出传力杆模型对模态频率和主振型有直接影响,动力分析中应当考虑接缝的剪力传递和弯矩传递。
The transfer of shearing and moment must be considered in dynamic analysis because the model of dowel bar affects the modal frequency and modal shape directly.
结论吊重起升加速度对起重机动载荷的影响较大,特别对主臂内的动弯矩的激励更加明显。
The influence of load hoisting acceleration on dynamic forces is obvious, especially on dynamic bending moment of the main boom.
应用推荐