黄壁庄水库主坝坝基渗流分析-交通工程论文-论文联盟 关键词:主坝 水位 过程线 坝基渗流 渗透坡降 [gap=278]Key words: primary dam; water level; correlation line; foundation seepage; seepage slope
基于252个网页-相关网页
某水库主坝灌浆工程的施工工艺探讨 - xzbu.com 中国论文网 关键词:主坝;灌浆;孔位放样;施工 [gap=232]Keywords: unsteading; Grouting; Hole a layout; construction
基于1个网页-相关网页
After working more than 40 years of Bajiaomiao Reservoir,the main dam has many hidden troubles.
八角庙水库运行40多年来,主坝出现多处隐患。
参考来源 - 八角庙水库主坝加固渗流稳定分析·2,447,543篇论文数据,部分数据来源于NoteExpress
火甲水库主坝渗漏,严重危及大坝安全。
The seepage of Huojia reservoir main dam was seriously and influenced the dam safety.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
应用推荐