居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.
水工墩墙结构广泛分布于水闸、涵洞、挡土墙等水利工程中,水工墩墙开裂已成为水利工程建设的一个通病。
Hydraulic pier structures are widely used in the construction of sluices, culverts and earth-retaining walls. Cracking of hydraulic piers becomes very common in hydraulic project construction.
在凤凰水电厂更新改造工程中,2、3、5、6号压力钢管的镇墩均出现不同程度的裂缝。
There are various degrees of cracks on anchorage block of No. 2, No. 3, No. 5, No. 6 penstock during in modification work of Fenghuang hydropower plant.