ill-posed problem
由于岩体在加载和卸载条件下应力路径的不同,仅采用加载条件下所建立的力学模型来研究隧道的开挖稳定性问题是不适合的。
Due to the difference in stress paths between the loading and unloading conditions, it is unsuitable to apply mechanical model under loading condition to stability of tunnel excavation.
youdao
应用推荐
模块上移
模块下移
不移动