The finalresults shows that the unavailability of the system is 9.21×10~(-4). And thatthe two circulating water pump fail at the same time is the biggest riskcontributor.
结果表明系统的不可用度为9.21×10~(-4),其中两台循环水泵同时失效是系统风险的最大贡献者。
参考来源 - 基于故障树技术的中国实验快堆核级循环冷却水系统可靠性分析及局部动态问题研究The reliability evaluation indices of bus arrangement systems are availability, unavailability, failure frequency, mean time between failure, mean time to repair, failure rate and repair rate.
文中计算的电气主接线系统的可靠性指标是:可用度,不可用度,故障频率,平均相邻故障间隔时间,平均修理时间,故障率,修复率。
参考来源 - M基地电力系统可靠性评估及改造方案研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐