head bay
·2,447,543篇论文数据,部分数据来源于NoteExpress
其第一级上闸首人字门的淹没水深达35米。
The immersed water depth of the upper miter gate at first step is up to 35 meters.
youdao
三峡工程—临时船闸上闸首、下闸首船闸液压系统总成。
Three Gorges Project-Upper and lower lock heads for the temporary ship lock Ship lock hydraulic system assembly.
应用推荐
模块上移
模块下移
不移动