其第一级上闸首人字门的淹没水深达35米。
The immersed water depth of the upper miter gate at first step is up to 35 meters.
三峡工程—临时船闸上闸首、下闸首船闸液压系统总成。
Three Gorges Project-Upper and lower lock heads for the temporary ship lock Ship lock hydraulic system assembly.
在此基础上研制了一台以开关电源作为高压直流电源、以氢闸流管作为主控开关的脉冲群电源。
HV EFT generator is developed, which adopts switching mode power supply as HV DC power supply and hydrogen thyratron as switch.
应用推荐