其第一级上闸首人字门的淹没水深达35米。
The immersed water depth of the upper miter gate at first step is up to 35 meters.
三峡工程—临时船闸上闸首、下闸首船闸液压系统总成。
Three Gorges Project-Upper and lower lock heads for the temporary ship lock Ship lock hydraulic system assembly.
测验办法是,地感红灯闪耀时,用铁板放在线圈上,红灯长亮时取走铁板,闸杆主动落下则正常。
The test solution is to sense light shine, put the coil with the plate, a long red light when taking iron, brake rod fall automatically is normal.
应用推荐