她的基本流程就是先建立一个产品“订单” (backlog),做一个“冲刺”(sprint)计划,执行它,每天开会讨论它,定期演示工作成果,对上一阶段工作做反省,接着再重复以上流程。
The process is build a product backlog, plan the sprint, execute and meet daily, demo the work, do a retrospective, and repeat.
医学专家认识到人们是在冬季的月份里染上流感已经有一段时间了。但直到最近他们也不知道为什么。
Medical experts have recognized for some time that people become infected with influenza during the winter months. But they did not really know why until recently.
轻组分向上流至催化剂段,在那里丁二烯选择性加氢、脱硫和一些烯烃的饱和同时进行。
The light constituents flow upward to the catalyst zone, where the selective hydrogenation of butadiene is carried out together with desulfurization and some olefin saturation.
应用推荐