混凝土的收缩徐变会引起混凝土连续梁桥不断上拱或下挠。
The shrinkage and creep of concrete will make concrete continuous beam Bridges hogging or deflecting...
结合工程实例,介绍钢筋混凝土水池池底板上拱的原因及处理措施。
In the combination with the project example, the paper introduces the cause and the treatment measures of reinforced concrete basin slab bulge.
上部结构的建筑高度为3英尺6英寸,有19英尺8英寸显著的上拱度。
The superstructure has a depth of 3 ft. 6 in. with a marked camber of 19 ft. 8 in.
应用推荐