第三期工程已于近期,在2011年年底完工。
The third phase of the project was recently completed at end of 2011.
然后,我们要决定是否需要改变计划,是否需要继续第二期和第三期工程。
Then we should decide whether we need changes, whether we should go ahead with the second and third stages.
长江引水三期工程采用大口径玻璃钢夹砂管,是首次在软土地基上敷设。
Large diameter GRP sand pipe used in Changjiang Water Diversion Project (III) is paved for the first time in the soft ground.
应用推荐