全面地介绍了新疆吉林台一级水电站工程主厂房排架的布置及设计情况。
The layout and design of the bent structure of Powerhouse of Jilintai No. 1 Hydropower Station were expounded in this paper.
吉林台一级水电站地处祖国西北边陲,大坝工程是按抗9度地震和满足严寒气候条件设计的。
The dam of Jilintai Hydropower Station I is designed with the specifications for the earthquake intensity of 9 and the severe cold climate.
悬栅消力池是在新疆喀什河吉林台一级水电站引水隧洞水力学模型试验中提出的一种新型消能工型式。
A new form of energy dissipater named suspended grid plunge pool is posed through the hydraulic model experiment of diversion tunnel in Jilintai first-or.
应用推荐