Yuanliangshan tunnel Maoba syncline 圆梁山隧道毛坝向斜
Yuanliangshan tunnel, with a total length of 11.068km, is the longest tunnel on Chongqing-Huaihua railway now under construction.
圆梁山隧道是目前正在修建的渝怀铁路线上最长的隧道,隧道全长11.068km。
参考来源 - 圆梁山隧道岩溶突水机理及其防治对策·2,447,543篇论文数据,部分数据来源于NoteExpress
By taking comprehensive gas prevention and control measures, the safety of the construction of Yuanliangshan tunnel under gas conditions is guaranteed.
本文通过瓦斯综合防治技术,解决了圆梁山隧道的瓦斯施工安全问题。
The suitable grouting parameters for Yuanliangshan tunnel. are verified by analyzing particular karst aquifers within high pressure and rich water zone.
针对圆梁山隧道高压富水区的岩溶水分布特点,确定了合理的注浆范围和注浆参数。
The paper presents the construction methods and corresponding machinery matching schemes adopted in each construction stage of exit portion of Yuanliangshan tunnel.
介绍圆梁山隧道出口端各个施工阶段的施工方案及相应的机械设备配置。