Yuanliangshan tunnel Maoba syncline 圆梁山隧道毛坝向斜

  • 圆梁山隧道 - 引用次数:11

    Yuanliangshan tunnel, with a total length of 11.068km, is the longest tunnel on Chongqing-Huaihua railway now under construction.

    圆梁山隧道是目前正在修建的渝怀铁路线上最长的隧道,隧道全长11.068km。

    参考来源 - 圆梁山隧道岩溶突水机理及其防治对策

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句

  • By taking comprehensive gas prevention and control measures, the safety of the construction of Yuanliangshan tunnel under gas conditions is guaranteed.

    本文通过瓦斯综合防治技术,解决梁山隧道瓦斯施工安全问题。

    youdao

  • The suitable grouting parameters for Yuanliangshan tunnel. are verified by analyzing particular karst aquifers within high pressure and rich water zone.

    针对圆梁山隧道高压水区的岩溶水分布特点,确定了合理注浆范围注浆参数

    youdao

  • The paper presents the construction methods and corresponding machinery matching schemes adopted in each construction stage of exit portion of Yuanliangshan tunnel.

    介绍梁山隧道出口各个施工阶段施工方案相应机械设备配置。