This paper makes a comprehensive analysis of some problems in designing and constructing a GMP workshop with the introduction of the test reports of HVAC of 4 GMP workshops in pharmaceutical factory.
通过对四家药品生产企业GMP车间净化系统检验情况的介绍,分析了一些GMP厂房设计、施工中的问题。
This position reports to Workshop Manager.
本职位向模具生产经理汇报。
应用推荐