Strictly implement production plan to ensure the balanced production and the linkage between different working orders.
严格执行生产计划,保证均衡生产和工序间的衔接。
By the experimental bench of bluff body flame and under different working orders, the speed in blowing out the flame of methane premixing gas with vapour is measured.
利用钝体稳定火焰实验台,在不同工况下,测量了含水蒸汽的甲烷预混气的火焰吹熄速度。
应用推荐