A small piece of the tunnel. Manual work. In total, more than 500 of them were produced.
此隧道的一小部分,手工制作。这些手工制作品的数量共计多于500个。
Research purposes: in order to ascertain geology condition of karst water bursting disaster in the course of tunnel caving and give a technique foundation for the work of tunnel geology prediction.
研究目的:明确岩溶山区深埋隧道施工突水灾害形成的地质条件,给隧道施工地质超前预报工作提供技术基础。
The difficult excavation is a difficult point in construction of wind-blown sand tunnel, thus, to ensure smooth going of excavation is a stress of excavation work.
风积砂隧道的施工难点是开挖难,如何保证开挖工作的顺利进行就成为开挖工作的重点。
应用推荐